Analytical HPLC instrument in a clean laboratory

WHO-GMP grade design

WHO-GMP and Revised Schedule M quality plan

Quality planning for NRJS begins with the facility design and continues through qualification and future batch release.

A quality system planned from design to release

01

Designed for compliance

Facility layout, HVAC zoning, water systems and material flows are being planned toward Revised Schedule M and WHO-GMP requirements.

02

Tested in-house

Chemical, microbiology and stability laboratories are planned to support material, in-process and finished product testing.

03

Documented and qualified

Equipment qualification and process, cleaning, HVAC and water validation are planned before commercial production.

Planned laboratory areas

Analytical HPLC instrument in a clean laboratory

Chemical analysis

Planned analytical testing for incoming materials, in-process samples and finished products.

HPLC · FTIR · UV spectrophotometer · Dissolution tester
Representative microbiology laboratory with a biosafety cabinet and incubators

Microbiology

Planned microbiological testing and environmental monitoring capability.

Biosafety cabinet · Incubators · Autoclave · Air sampler
Representative gloved hands placing sample vials inside a stability chamber

Stability studies

Planned controlled storage studies to assess product quality over time.

Stability chambers · Temperature and humidity monitoring

Quality systems in the project scope

01

Documentation & change control

Controlled procedures, records and documented review of proposed changes.

02

Deviation & CAPA

A planned process to record events, investigate causes and track corrective actions.

03

Batch records & line clearance

Planned batch documentation and checks before production and packaging activities.

04

Training & hygiene

Role-based GMP training and documented hygiene practices are part of the quality plan.

Certification roadmap

Planned

  • Revised Schedule M
  • WHO-GMP
  • GLP
  • ISO 9001
  • ISO 14001
  • ISO 45001
  • COPP

Future phase

  • EU-GMP
  • PIC/S alignment

The standards listed are project targets. The Durgapur facility is not currently represented as licensed or certified.

Questions about the project

These answers describe current project status and future operating plans.

Is the NRJS plant WHO-GMP certified?

Not yet. The plant is being designed to WHO-GMP and Revised Schedule M, and certification will be applied for at commissioning.

What laboratories will the plant have?

Chemical, microbiology and stability laboratories on site.

What is DQ, IQ, OQ and PQ?

The four stages of equipment qualification: design, installation, operational and performance qualification.